• From sales to installation Teleflex guarantees quality. With own engineering, production, test facilities, programming and installing we keep our standards high....

The advantages of overhead conveyors for woodworking assembly

As a modern woodworking factory firm De Mors decided to optimize and accelerate various woodworking activities. Until recently De Mors used their overhead monorail conveyor mainly for coating processes. In order to improve productivity on the complete assembly line including packaging and preparations for dispatch, the new system carries products through the various steps of the finishing process. It increases efficiency and flexibility and frees up valuable floor space.
http://www.demors.nl/

Kreuznacher Zentralwäscherei GmbH

For Kreuznacher Zentralwäscherei GmbH in Bad Kreuznach (DE), TFX Railtechnik installed a Teleflex T1 power and free conveyor. The conveyor has a length of 95 meters and equipped with pusher dogs, stop stations and vertical bends to compensate the height difference of 7 meters. The system is equipped with 35 pieces of load bars to transport laundry rolcontainers.

http://www.dunnewolt.nl/en/t1-power-and-free-kreuznacher-zentralw%C3%A4scherei-d...
26.08.2015

Knights Commercial Laundry in Toowoomba (AUS)

Dunnewolt B.V. awarded with a new major contract to supply and install a new D2 and D3 Dunnewolt monorail conveyor at Knights Commercial Laundry in Toowoomba (AUS).  The order also contains the delivery of 14 Dunnewolt stainless steel sorting bins, several loading and sorting belts and the complete installation of above components.

Start assembly December 2015.  

http://knightslaundry.com.au
27.05.2015

Aramark Inc. in Stockton (USA)

Dunnewolt B.V. delivered and installed an extension to the D2 – 820 monorail system at Aramark in Stockton (USA). The purchase order from Senso Technics B.V. contained also 2 pieces new and redesigned original Dunnewolt stainless steel sorting bins respectively with 12 and 16 positions. Also 100 new bag containers, several pneumatic and electric hoists, switches and switch sections, bends etc. were installed. Also a general overhaul was performed at the existing Dunnewolt conveyor.      ... ...

18.03.2015

Timmerfabriek Hardeman B.V. - Lunteren (NL)

At Timmerfabriek Hardeman B.V. in the Netherlands, Railtechniek installed a monorail bridge crane. The bridge crane is a customer designed low headroom execution.  To optimize the lifting height 2 pieces GIS GPM250 electric chain hoist were built in a double bridge crane with a unique moveable  suspension framework. With the use of an enclosed conductor system the electrical cables are reduced to an minimum.  

 

http://www.whardeman.nl